Circular No 2019/007 Submission of Mandatory Forms in AL ADAA Portal
007/2019 تعميم رقم بشأن الإلتزام برفع النماذج الإلزامية في برنامج الأداء الإلكتروني
To all contractors, consultants, and developers working in building & construction sector in Abu Dhabi City.
إلى جميع المقاولين والمكاتب الإستشارية والمطورين العاملين في قطاع البناء والإنشاء داخل مدينة أبوظبي.
As Abu Dhabi City Municipality always enhances OSH procedures for all entities working within the building and construction sector, all contractors, consultants, and developers are requested to comply with the following:
حرصا من بلدية مدينة أبوظبي لضمان تعزيز إجراءات السلامة والصحة المهنية لجميع الكيانات العاملة في قطاع البناء والإنشاء يرجى من جميع المقاولين والإستشاريين والمطورين الإلتزام بالآتي:
Occupational Safety and Health Requirements
متطلبات السلامة والصحة المهنية
All building construction sector approved OSHMS entities shall committed to submit the following reports on time at AL ADAA portal:
OSH implementation costs report (Form E4) shall be submitted annually by the first quarter of each year.
Also all entities in the building and construction shall report all serious reportable OSH incidents to Abu Dhabi City Municipality & submitting the following reports at AL ADAA portal:
OSH incidents notification report (Form G).
OSH incidents investigation Report (Form G1).
إلتزام جميع الكيانات التي تم إعتماد أنظمتها لإدارة السلامة والصحة المهنية على الحرص بتقديم التقارير التالية في نظام الأداء وذلك في الوقت المحدد بكل تقرير وهي كالاتي:
تقرير أداء نظام السلامة والصحة المهنية الربع سنوي (النموذج E).
تقرير التدقيق الخارجي السنوي على نظام إدارة السلامة والصحة المهنية من طرف ثالث (النموذج F).
تقرير التكلفة التطبيقية السنوية لنظام إدارة السلامة والصحة المهنية (النموذج E4) وتقديمه سنوياً خلال الربع الأول في كل عام.
كما يجب على جميع الكيانات إبلاغ بلدية مدينة أبوظبي في حالة وقوع الحوادث البليغة القابلة للإبلاغ في مواقع البناء والإنشاء والإلتزام بتقديم النماذج الآتية في نظام الأداء:
تقرير الإبلاغ عن وقوع الحوادث (النموذج G).
تقرير التحقيق في الحوادث (النموذج G1).
This is for everyone's strict compliance as per the requirements of Abu Dhabi Emirate Occupational Safety & Health System Framework (OSHAD SF) and according to the specified time frame.
على الجميع الإلتزام بذلك وفقاً لمتطلبات الإطار العام لنظام إمارة أبو ظبي للسلامة والصحة المهنية وذلك حسب الوقت المحدد.
لمزيد من المعلومات يرجى التواصل على البريد الإلكتروني: hse@adm.gov.ae
www.dpm.abudhabi.ae
ص ب: 3 ، أبوظبي، الإمارات العربية المتحدة، هاتف: 555 6785 (2) 971+، فاكس: 755 7777 (2) 971+
P.O.Box 3, Abu Dhabi, United Arab Emirates, Tel: +971 (2) 6785 555, Fax: +971 (2) 6777 755
AbuDhabi_ADM AbuDhabiADM
Circular No 2019/007 Submission of Mandatory Forms in AL ADAA Portal
Circular No 2019/007 Regarding the Commitment to Upload Mandatory Forms in the Electronic Performance Program
To all contractors, consultants, and developers working in building & construction sector in Abu Dhabi City.
To all contractors, consulting offices, and developers working in the building and construction sector within Abu Dhabi city.
As Abu Dhabi City Municipality always enhances OSH procedures for all entities working within the building and construction sector, all contractors, consultants, and developers are requested to comply with the following:
In the interest of Abu Dhabi City Municipality to ensure the enhancement of occupational safety and health procedures for all entities working in the building and construction sector, all contractors, consultants, and developers are requested to comply with the following:
Occupational Safety and Health Requirements
Occupational Safety and Health Requirements
All building construction sector approved OSHMS entities shall committed to submit the following reports on time at AL ADAA portal:
OSH implementation costs report (Form E4) shall be submitted annually by the first quarter of each year.
Also all entities in the building and construction shall report all serious reportable OSH incidents to Abu Dhabi City Municipality & submitting the following reports at AL ADAA portal:
OSH incidents notification report (Form G).
OSH incidents investigation Report (Form G1).
All entities whose OSH management systems have been approved shall commit to submitting the following reports in the AL ADAA portal on time for each report, as follows:
Quarterly OSH system performance report (Form E).
Annual external third-party audit report on the OSH management system (Form F).
Annual implementation cost report for the OSH management system (Form E4) to be submitted annually during the first quarter of each year.
Also, all entities must inform Abu Dhabi City Municipality in the event of serious reportable incidents at construction sites and commit to submitting the following forms in the AL ADAA portal:
Incident notification report (Form G).
Incident investigation report (Form G1).
This is for everyone's strict compliance as per the requirements of Abu Dhabi Emirate Occupational Safety & Health System Framework (OSHAD SF) and according to the specified time frame.
Everyone must comply with this in accordance with the requirements of the Abu Dhabi Emirate Occupational Safety & Health System Framework and according to the specified time frame.
For more information, please contact via email: hse@adm.gov.ae
www.dpm.abudhabi.ae
P.O.Box: 3, Abu Dhabi, United Arab Emirates, Tel: +971 (2) 6785 555, Fax: +971 (2) 6777 755
P.O.Box 3, Abu Dhabi, United Arab Emirates, Tel: +971 (2) 6785 555, Fax: +971 (2) 6777 755
AbuDhabi_ADM AbuDhabiADM
Document Criteria
Document Number
7
Year
2019
Levelالمستوى
Localمحلي
Categoryالفئة
Legislationsتشريعات
Statusالحالة
Activeساري
Typeالنوع
Circularتعميم
Sectorالموضوع
Municipalityالبلدية
Related Documents
Administrative Decision No. (1) of 2024 regarding the application and activation of the Building Occupancy Certificate system in the Emirate of Abu Dhabi
قرار إداري رقم (1) لسنة 2024 بشأن تطبيق وتفعيل منظومة شهادة الإشغال للمباني في إمارة أبوظبي